Bewertung des Restaurationspotenzials

Auftraggeber

The World Bank

Land

Kirgisistan

Zeitraum

2020–2022

Fachbereiche

Forestry, Klima

Projektland·Kirgisistan

Hintergrund

In the mountainous regions of Kyrgyzstan, land degradation is an important issue which has serious implications of rural livelihoods. The Toktogul hydro power dam has exacerbated land degradation issues in the surrounding watershed. In response, the World Bank RESILAND resilient landscapes regional program in Central Asia aims to enhance capacity building in landscape restoration. The objective of the project was to perform a national-level analysis of feasible integrated landscape restoration and catchment area management measures to reduce sediment inflows at the Toktogul reservoir. A Restoration Opportunities Assessment Methodology (ROAM) exercise was conducted, which included a valuation of landscape restoration. UNIQUE was selected for this assignment due to our strong regional experience and knowledge regarding restoration measures.

Unser Beitrag

  • Baseline establishment of degradation hotspots
  • Identification of nature-based restoration strategies
  • Analysis of priority areas for restoration
  • Analysis of restoration readiness and strategies
  • Capacity Building on landscape restoration
  • Analysis of investment options for restoration
← Alle Projekte

Tippen zum Suchen

Fragen Sie nach Thema, Land, Auftraggeber oder Methode.

    Durchsucht den Volltext aller Referenzen – in beiden Sprachen. Alle Projekte anzeigen